DA Ranch landscape update 2-10-2026

Here are some pictures showing the latest improvements with some commentary.

Completion of the low rock wall modification

Steps and planter at the north edge of the deck

Adding soil to raise the grade adjacent to the rear deck

Begining placment of boulder on rear slope

Stockpiling of boulders retrieved from creek for use on rear slope

Footing for CMU retaining wall on rear slope excavated and ready for the next step

Pavers in parking area completed

Paver parking area matched to existing pavers. Working on perennial garden block wall along the edge of the path.

Showing the soil backfill we are using behind the new low rock walls that will elevate the plantings and make them more prominent.

An embedded rock border on the east side of the driveway area delineates the roadway from the planting area.

Working on the pavers that connect the rear deck steps to the main driveway area.